Place of Origin: | China |
Brand Name: | Hengquan |
Certification: | ISO 9001 |
Model Number: | Cell Height:50-250mm |
Minimum Order Quantity: | 1000m2 |
---|---|
Price: | 1usd/Squre meter, Other types need to Deliberation |
Packaging Details: | packing belt |
Delivery Time: | 5-8 days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 40000 Squre meters per week |
Name: | Geocell Confinement System | Description: | Platic Parking Grass Grid Geocell |
---|---|---|---|
Free Sample: | Customer Pay Freight | Corrosion Resistance: | Excellent Corrosion Resistance |
Thickness: | 1.0mm | Surface: | Textured |
Cell Height: | 50mm | Material: | HDPE |
Transport Package: | Plastic Packing Belts | Feature: | Corrosion Resistant, Oxidation Resistance, Chemical Stability, Wear-resistant |
High Light: | astm standard geocell driveway,50mm height geocell driveway,50mm height hdpe geocell |
ASTM standard HDPE Geocell 50mm height geo cell road grid gravel honeycomb gravel driveway
About Hengquan
We have experience for more than 7 years. There are two product lines for geogrid and geocell. Factory work 24hours a day, we sold more than 100,000,000rmb last year(2020). Our customers are all over the world.
Brief Introduction of Geocell Confinement System
Cellular cellular confinement system (geocell) is a soil reinforcement and erosion protection material with honeycomb texture and three-dimensional structure, made of high-density polyethylene alloy. It is generally used on sloping surfaces to prevent soil loss that may occur due to water and wind. The reason why it is produced in a perforated structure is fast drainage and easy compression of the filling material. Cells adhered with special ultrasonic welding technology in the factory are sent to the field in strips.
Geocell Confinement System Characteristic
The maintenance of paved and unpaved roads and highways has always been a major problem for all road owners. If the road is not designed and constructed properly, the service life of the road will be greatly shortened, resulting in traffic interruption. Such roads will have pits, uneven pavement, and easy to settle on the extension section, thus interfering with the traffic. The geocell is filled with sand / metal as the subgrade to improve the pavement strength, reduce settlement and form a reflective layer
Cracks and holes. In addition, the use of geocell not only reduces the thickness of the pavement part, but also significantly reduces the downtime caused by maintenance.
Laying method
Construction method:
① Foundation treatment
Firstly, the lower layer shall be leveled and rolled. The flatness shall not be greater than 15mm, and the compaction shall meet the design requirements. Hard protrusions such as gravel and stones are strictly prohibited on the surface.
② Laying geogrid
a. When storing and laying geogrids, avoid exposure and long-term exposure to avoid deterioration of performance.
b. It shall be laid perpendicular to the line direction, overlapped and firmly connected according to the requirements of the design drawings. The strength of the joint in the stress direction shall not be less than the design tensile strength of the material, and its lamination length shall not be less than 20cm.
c. The quality of geogrid shall meet the requirements of design drawings.
d. During construction, it is necessary to maintain continuity without deformation, wrinkling and overlap. Pay attention to tension the grid by hand to make it uniform and flat, close to the lower bearing surface, and fix it with nails and other measures.
e. For the geogrid, the long hole direction is consistent with the cross section direction of the line, and the geogrid shall be straightened and leveled. The end of the grating shall be treated according to the design.
f. After the geogrid is laid, the filler shall be filled in time at an interval of no more than 48 hours to avoid direct exposure to the sun.
③ Fill
After the grating is laid, it shall be filled in time. The filling shall be carried out according to the symmetrical principle of "two sides first and then the middle", and it is strictly prohibited to fill the middle of the embankment. The filler shall not be unloaded directly on the geogrid, but must be unloaded on the paved soil surface, and the unloading height shall not exceed 1m. All vehicles and construction machinery shall not walk directly on the paved geogrid, but only along the embankment.
④ Rolling grating
After the first layer of filler reaches the predetermined thickness and is rolled to the design density, roll the grid back for 2m, bind it to the previous layer of geogrid, manually trim and anchor, and plant 1m soil outside the rolling end to protect the grid from human damage.
⑤ The laying of one layer of geogrid shall be completed according to the above method, and the laying of other layers of geogrid shall be carried out according to the same method and steps. After the grid is laid, the upper embankment will be filled.
Factory and Equipment:
Product inventory:
Application:
Functioning by filling the pores with a three-dimensional honeycomb structure, the geocell cellular confinement system offers alternative solutions to geogrid material. Working with the logic of geogrid, geocell undertakes the tasks of reinforcement of geogrids on the ground and reinforcement on retaining walls. Differently, cellular confinement systems work by filling the cellular fillings.
Year of Registration: 2014
Place of Registration: China
Registrated Capital: CNY105,000,000.00
Briture Co., Ltd
was approved by Chinese Bureau of Commerce
Tel: +8615031817097
Whatsapp/Wechat: +8615031817097
Email: leo@hengquan-china.com
Website: www.plastic-geogrid.com
Download PDF: Catalog of Hengquan - geocell.pdf
Contact Person: Mrs. ruby
Tel: +86-13623182253
Fax: 86-318-7990083
Prevent Soil Erosion black 25KN/m Geogrid For Slope Stabilization
High Strength Polyethylene Width 4m Geogrid For Gravel Roads
Tunnel Reinforcement Width 3.9m 30KN Biaxial Plastic Geogrid
Retaining Wall 1000N 150mm Geocell Cellular Confinement System
Stabilize Highway Textured 1.6mm Geocell Road Construction
Retaining Walls Ultrasonic Welding 1.6mm Geocell Confinement System
Environmental Protection 1.7mm 200g Non Woven Polyester Geotextile
Erosion Control Short Fiber 270gsm Non Woven Geotextile
High Tensile Strength Anti Acids 800g Non Woven Geotextile Fabric